August 27, 2026

After Long Administrative Delay KMRNP Officially Resumes with the Construction of Bakau Newton Road.

0

Bakau New Town Road is a 1.53km long road of 7m width road, It will be:

Cement stabilized base

Cement concrete pavement

Bituminous Prime coat

Bituminous Track Coat

Double Bituminous Surface Treatment

It cost of D22million (fully paid)

to be executed in a period of 4months.

This road is one of 11 roads part of the KMRNP.

@KMC@Work

Leave a Reply

Facebook
error: Content is protected !!