After Long Administrative Delay KMRNP Officially Resumes with the Construction of Bakau Newton Road.
Bakau New Town Road is a 1.53km long road of 7m width road, It will be:
Cement stabilized base
Cement concrete pavement
Bituminous Prime coat
Bituminous Track Coat
Double Bituminous Surface Treatment
It cost of D22million (fully paid)
to be executed in a period of 4months.
This road is one of 11 roads part of the KMRNP.
@KMC@Work




